top of page

Wall Construction

  1. Completely remove tub with surround, drywall including the ceiling drywall over tub.

  2. Prepare studs by removing nails and sanding high spots.

  3. Check level and square, make adjustments.

  4. Install tub.

  5. Install wall sheeting and waterproof membrane.

bottom of page