top of page

Tub Installation

  1. Verify walls are squared and straight.

  2. Verify all drain plumbing is complete and functional.

  3. Prepare the base with expandable foam or similar product.

  4. Place the tub over the new plumbing.

  5. Verify square and level.

  6. Secure tub to studs.

soaker tub.png
bottom of page